Yoshino Metal System Ceiling 35
Yoshino Metal System Ceiling 45
Note For Installation:
- In the connector clip of the Yoshino Metal Ceiling frame system, an indentation is made to make it easier to lock the channel so that it is stronger
- All gypsum board joints must be staggered
- Yoshino Metal System Ceiling Standard is Based on ASTM 840 – 11
- It is recommended to use control joint every 10 meters
- The frame distance is 1200, the lower frame is 600 and the hanger distance is 1200
- Pay attention to the installation of the connector clip. The part where the indentation remain should be installed on the open part (as in the picture)